The article reports on the completion of a new section at the Galeb Preschool in Rijeka, Croatia, which has added 16 additional spots for infants. The expansion includes two mixed-age care groups, play areas connected to partially covered terraces, and thermal connections to the existing building. The project cost 1.58 million euros including VAT and was funded through a combination of municipal and non-recoverable funds via a competition under the National Recovery and Resilience Plan 2021–2026. The construction was carried out by Zanatska zadruga Gradin, supervised by Infra-plan and designed by Igor Koprivnjak and Stipica Živković. Energy-efficient solutions were implemented, including a low-energy building design with heating systems and renewable energy sources. The expansion also included accessibility improvements such as ramps for people with reduced mobility and parking facilities.
Bias read (Center): The article presents a factual report on a public infrastructure project related to early childhood education, focusing on technical specifications, funding sources, and implementation details. There is no overt ideological framing or emphasis on political parties, policies, or controversies. The sl





