The maintenance and repair of the Pelješki Bridge, a major infrastructure project completed just four years ago, has begun. The work involves addressing micro-cracks in the surface layer of concrete on all six bridge pillars, which have expanded into a lattice pattern. These cracks range in depth from 3.5 to 6 centimeters and contain moisture. The repairs aim to prevent water and salt from reaching the reinforcing structure of the pillars, which could cause corrosion and pose a risk of concrete fragments falling onto the road. The Chinese construction firm responsible for building the bridge, China Road and Bridge Corporation (CRBC), will carry out the repairs using a local subcontractor. The process includes removing the damaged surface layer, replacing it with new concrete reinforced with carbon fibers, and applying a protective polyurethane coating. The repairs are expected to start in November and continue until the next tourist season, potentially extending into the following autumn if necessary.
Bias read (Center): The article provides a balanced overview of the technical aspects of the bridge's maintenance, citing official statements from Hrvatske ceste and referencing expert assessments. There is no overt ideological framing or biased language; the focus is on structural integrity and engineering solutions.

![Only 50 months after opening: Cracks in the bridge, from one to two inches [3.5 to 6 cm] deep](https://images.weserv.nl/?url=www.zurnal24.si%2Fmedia%2Fimg%2Fc7%2Ff6%2F7547aa3e8923ba15a580.png&w=3840&q=75&output=webp&we)



