The article reports on upcoming roadworks on the Styrian motorway (A3), which will result in partial closures starting in September 2026. The section between Slovenj Gradec and Domažlice, as well as between Domažlice and Ljubljana, will undergo repairs, requiring traffic to be redirected to one lane in each direction. Construction of the Devina viaduct near the Slovenska Bistrica North junction will continue until the end of 2026. Additionally, a previous closure between Slovenske Konjice and Dramlje will be lifted by October 4th, allowing two lanes in each direction. However, further work is expected into the 2027 construction season, meaning drivers traveling from Maribor to Ljubljana will encounter at least one partial closure by year-end.
Bias read (Center): The article presents factual information about infrastructure projects and their impact on traffic without taking a clear ideological stance. It provides balanced reporting on the timing and scope of the roadworks without emphasizing any particular political agenda or perspective.



-U33638501473jaY-1200x630%40diario_abc.jpg&w=3840&q=75&output=webp&we)


