Billions for school infrastructure went to contractors tied to flood control scam
The article highlights the severe overcrowding at Mabuhay City Elementary School in Cavite, where 1,500 students share a single three-story building while a second structure remains unfinished due to bureaucratic errors regarding funding requests. This local issue reflects broader systemic failures in the Philippine government's school infrastructure program, which faces a backlog of 166,000 unbuilt classrooms and approximately 1,000 unusable structures recently constructed by the Department of Public Works and Highways. Following a major flood control corruption scandal, President Marcos redirected billions of pesos from the canceled flood control budget to the 2026 education sector, marking the largest school infrastructure allocation in eight years. However, the report questions whether these funds will effectively address the crisis, noting that previous allocations were plagued by poor planning, faulty procurement, and fraud. The piece introduces an investigation by the Philippine Center for Investigative Journalism analyzing over 30,000 school contracts from 2016 to 2026 to determine if similar anomalies persist in the new budget cycle.
Former Department of Public Works and Highways assistant engineer Brice Hernandez pleaded not guilty on Tuesday in the Sandiganbayan regarding a second malversation case. He appeared before the anti-graft court’s Fourth Division alongside six other former DPWH officials. The group included Arjay Domasig, Jaypee Mendoza, Juanito Mendoza, Christina Mae Pineda, Niño Morales, and Floralyn Simbulan. All seven respondents entered the same plea during the proceedings. The specific case involves allegations concerning a nonexistent riverbank protection structure located in Balagtas, Bulacan. Prosecutors stated the project was valued at 77 million pesos. It was allegedly constructed by Sunwest, a firm founded by Zaldy Co, a former representative from Bicol. Although Co is named in the case, he did not attend the hearing. The Sandiganbayan previously declared him a fugitive from justice. Under current rules, individuals designated as fugitives cannot participate in legal proceedings or seek judicial relief unless they voluntarily surrender to authorities. Two of Co’s employees, John Paul Estrada and Mark Tecsay, remain at large according to court records. This proceeding represents the second malversation case facing Hernandez and Co. Their initial case concerns a 289.4 million peso project in Naujan, Oriental Mindoro. Prosecutors claimed that structure suffered from serious structural deficiencies. For Domasig, both members of the Mendoza family, and Pineda, this is also their second such case. Their first malversation trial is currently handled by the Sandiganbayan’s Third Division. That case focuses on an alleged ghost flood control project in Pandi, Bulacan, valued at 92.8 million pesos. Former Senator Bong Revilla is a co-accused in that separate matter. He is currently out on bail set at one million pesos. Separate investigations into public works anomalies extend beyond these specific trials. An analysis of over 30,000 school infrastructure contracts awarded by the DPWH between 2016 and 2026 reveals systemic issues similar to those found in flood control projects. The review identified instances where politically connected contractors with histories of graft received awards. Lobbying by legislators also influenced funding distribution, often favoring specific areas over equitable national coverage. Additionally, bureaucratic delays in identifying projects contributed to significant implementation backlogs. These challenges are visible in locations like Dasmariñas, Cavite. At Mabuhay City Elementary School, 1,500 students occupy a single three-story building. They operate on three shifts, with 500 students per shift, crowded into 13 classrooms. Each class holds roughly 40 pupils for four-hour sessions. A second three-story building nearby has remained idle and unfinished for nearly two years. The project cost 32 million pesos and was contracted to L.A. Clamor Construction. The DPWH’s Cavite 3rd District Engineering Office stated that the site required structural adjustments due to its proximity to a waterway. While the contractor met the revised scope, the project halted because funding requests mistakenly specified a four-story structure instead of the actual three-story build. This error left the project in administrative limbo. School head Ramon Novicio noted that the new building would alleviate overcrowding and provide space for a library, canteen, and science lab. In 2025, Education Secretary Sonny Angara reported that approximately 1,000 DPWH-built classrooms were unusable. Another 166,000 classrooms had yet to be constructed. Following the previous year’s flood control scandal, President Marcos cancelled the flood control budget and redirected a substantial portion to education. Consequently, up to 80 billion pesos was allocated to the 2026 school infrastructure budget. This marks the largest allocation in eight years. Government measures aim to limit fraud by assigning projects to local governments and regional DPWH offices rather than district offices, which were implicated in prior scandals. Some erring contractors have had their licenses revoked and faces bans from future public works projects.
Go to the primary sources (4)
The official sources this coverage is built on. Read them directly to bypass framing.
Former DPWH assistant engineer Brice Hernandez pleaded not guilty in his second malversation case before the Sandiganbayan anti-graft court. The case involves an alleged non-existent riverbank protection structure worth ₱77 million in Bulacan’s Balagtas town, constructed by Sunwest, a company founded by former Ako Bicol representative Zaldy Co. Co, who is a fugitive from justice, cannot participate in the proceedings. This is Co’s second malversation case, following a ₱289.4 million project in Oriental Mindoro with serious structural issues. Other accused include former DPWH officials Arjay Domasig, Jaypee Mendoza, Juanito Mendoza, Christina Mae Pineda, Niño Morales, and Floralyn Simbulan. The case is handled by the Fourth Division, while their first malversation case involving a ₱92.8 million ghost flood control project in Pandi, Bulacan, is under the Third Division with former Senator Bong Revilla as a co-accused.
Bias read (Center): The article presents factual legal proceedings without overtly favoring any political side. It reports on multiple individuals involved in corruption cases without taking a clear ideological stance, focusing on the legal process and outcomes rather than promoting a specific political agenda.
Why factuality (85): The article reports on Brice Hernandez pleading not guilty in his second malversation case, citing the specific amount involved (₱77 million) and naming other individuals implicated. It references the Sandiganbayan court and provides details about the case, including the status of Zaldy Co as a fugi
Why objectivity (80): The article presents the legal proceedings in a straightforward manner, focusing on the facts of the case. However, it mentions that Zaldy Co is a fugitive from justice and refers to previous cases, which may subtly imply guilt or wrongdoing. While not overtly biased, there is a slight tendency to f
Former Public Works and Highways Secretary Manuel Bonoan testified before the Sandiganbayan Fourth Division regarding a graft trial involving former officials. He stated that President Ferdinand Marcos Jr. requested his resignation a year ago due to public anger over the flood control corruption scandal. The testimony centers on allegations of corruption related to infrastructure projects and highlights the political implications of the case.
Bias read (Progressive): The article frames the resignation request as stemming from public outrage and implicates the president in the decision, which suggests a critical stance toward the administration. While not explicitly partisan, the narrative aligns with opposition perspectives by highlighting executive misconduct.
Why factuality (85): The article cites former DPWH chief Manuel Bonoan stating that President Marcos asked him to resign during the flood control corruption scandal. This aligns with the cross-source consensus that there was public outrage over the issue and ongoing legal proceedings. The information appears to be based
Why objectivity (70): The article presents the statement as a factual claim but uses emotionally charged language such as 'public outrage' and 'graft trial.' While it doesn't overtly take sides, the focus on the president's involvement may subtly imply political accountability rather than presenting a purely objective ac
As of September 3, 2026, the Office of the Ombudsman in the Philippines confirmed that 35 cases related to the flood control scandal are currently pending in courts. Of these, 31 are being handled by the anti-graft court Sandiganbayan, while the remaining four are under various regional courts. These cases involve allegations of corruption and mismanagement tied to a multi-billion-peso flood control project. Senator Jinggoy Estrada is the highest-ranking official arrested in connection with the scandal, while former Representative Zaldy Co has avoided legal proceedings since 2025. The Ombudsman is also conducting preliminary investigations into 166 flood control-related complaints and performing 107 lifestyle checks on public officials and employees.
Bias read (Center): The article presents factual information about ongoing legal proceedings involving high-profile politicians and does not exhibit overtly biased language, framing, or sourcing. It provides context about the legal framework governing corruption cases and mentions both prosecution efforts and obstacles
Why factuality (65): The article references Republic Act No. 10660 but only partially quotes it, focusing on the jurisdiction of Regional Trial Courts. It mentions 35 flood control cases pending in courts, with 31 in the Sandiganbayan and 4 in regional courts. While these numbers are presented as facts, they lack direct
Why objectivity (70): The article presents the information neutrally, reporting the Ombudsman's statement without apparent bias. However, it includes a note that the content is AI-generated, which could affect perceived objectivity. The tone remains informative without overt emotional language.
The article highlights the severe overcrowding at Mabuhay City Elementary School in Cavite, where 1,500 students share a single three-story building while a second structure remains unfinished due to bureaucratic errors regarding funding requests. This local issue reflects broader systemic failures in the Philippine government's school infrastructure program, which faces a backlog of 166,000 unbuilt classrooms and approximately 1,000 unusable structures recently constructed by the Department of Public Works and Highways. Following a major flood control corruption scandal, President Marcos redirected billions of pesos from the canceled flood control budget to the 2026 education sector, marking the largest school infrastructure allocation in eight years. However, the report questions whether these funds will effectively address the crisis, noting that previous allocations were plagued by poor planning, faulty procurement, and fraud. The piece introduces an investigation by the Philippine Center for Investigative Journalism analyzing over 30,000 school contracts from 2016 to 2026 to determine if similar anomalies persist in the new budget cycle.
Bias read (Progressive): The framing emphasizes systemic government failure, corruption, and bureaucratic incompetence, using critical terms like 'scandal' and 'fraudulent procurement' to highlight state inefficiency.
How each side covered it
The same event, grouped by the political lean of the outlets covering it.
progressive
center
conservative
★
How each side covered it
Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.