ON
← Back to feed
For washing, fog and eternal flame, here's how much it costs to maintain the Monument to the Fatherland.
Croatia🏛️ PoliticsCenteryesterday

For washing, fog and eternal flame, here's how much it costs to maintain the Monument to the Fatherland.

The article discusses the maintenance requirements and costs associated with the 'Spomenik domovini' monument in Zagreb, Croatia. The monument, officially unveiled in December 2020, consists of three components: the Wall of Light, the Eternal Flame Monument, and the Portal Pavilion. It includes complex systems such as irrigation, fountains, and lighting. The city of Zagreb has initiated a public consultation process to select a company for maintaining the monument over approximately 180,000 years. The maintenance contract will last one year and involves tasks like cleaning the stone walls with specific detergents, preventing water contamination in the fountain system, addressing vandalism, and managing the misting system controlled from the National Library’s workshop. The monument was previously damaged during an earthquake and required repairs costing around €33,000.

A sudden water crisis has forced the temporary closure of three swimming pool systems at the Svetice complex in Zagreb due to flooding in their technical rooms. The incident occurred overnight on Monday into Tuesday, according to officials from the City’s Sports Facilities Management Office (USO). The affected pools include competition, school, and hydro-massage facilities, with staff reporting that part of the automatic pumping system was non-functional during the emergency. As a result, large portions of operational equipment were submerged, necessitating urgent repairs to circulation and submersible pumps before the systems can resume normal operations. The USO confirmed that, at this time, it is not possible to ensure the preparation of water in the main three pools in accordance with all health and technical regulations. This has led to the decision to suspend operations until the fault is resolved, primarily for safety reasons and to protect users' well-being. While the Svetice facility remains closed, residents of Zagreb still have access to other public swimming pools, including the Mladost Sports Park, the Utrina Pool (until August 15, after which it will undergo renovation), and the Šalati SRC. A new pool in Španskom is expected to open soon, offering additional recreational options. In separate developments, the maintenance of Zagreb's Spomenik Domovini, a monument dedicated to Croatia's Homeland War, has been placed under a competitive tender process. The structure, unveiled in December 2020, stands between the city hall and the Vatroslav Lisičić Concert Hall. It consists of three components: the Wall of Light, the Eternal Flame Monument, and the Portal Pavilion. The total cost of its construction was approximately 34.7 million kuna (around 4.5 million euros), with the architect being Nenad Fabijanić. The monument suffered damage following an earthquake and required a two-month repair period costing around 33,000 euros. The tender aims to find a company responsible for maintaining the monument for an estimated 180,000 years. The scope includes the upkeep of the irrigation system, fountain, lighting, and cleaning of the stone mass. Special attention is given to the maintenance of the glass wall, which requires regular cleaning using standard window cleaners but must avoid contamination of the fountain water treatment system. Cleaning should be done with cotton or microfiber cloths, and the use of metallic tools or scalpels is prohibited to prevent damage to the glass. Additionally, the monument features a misting system controlled from the technical room of the National and University Library, requiring collaboration with coordinators from that location. The Portal Pavilion on the rooftop includes heating elements against freezing, which need regular inspection. The stone mass with the flame must be maintained through water-based cleaning and stone-cleaning agents. The monument also faces challenges such as vandalism, which must be addressed within 24 hours. The winning company will enter into a one-year contract and will work closely with designated coordinators to ensure compliance with all maintenance requirements. The situation at the Svetice pools highlights the importance of routine maintenance and contingency planning in public infrastructure. Meanwhile, the ongoing efforts to preserve and maintain Zagreb’s cultural landmarks reflect the broader commitment to safeguarding both functional and symbolic aspects of the city’s identity. As the city continues to navigate these challenges, the focus remains on ensuring public safety and preserving community resources.

How each side covered it

The same event, grouped by the political lean of the outlets covering it.

How each side covered it

Support independent, bias-aware news and unlock the social pulse, community voting, and your personalized For You feed.

Become a Supporter

Covered around the world

The same event as reported in other countries.

Covered around the world

Support independent, bias-aware news and unlock the social pulse, community voting, and your personalized For You feed.

Become a Supporter

Claims check

Key factual claims, and how many sources assert vs dispute each.

Claims check

Support independent, bias-aware news and unlock the social pulse, community voting, and your personalized For You feed.

Become a Supporter

2 reports

Jutarnji list logoJutarnji listIndependentCenterFactual 85Objective 804 days ago
Nightly drama in Zagreb's swimming pools: We're closing everything, because of a malfunction, our engine room flooded

The article reports on an incident at the Svetice swimming complex in Zagreb where flooding caused by a technical failure led to the temporary closure of three swimming systems. The issue arose overnight between Monday and Tuesday due to a malfunction in the pool equipment, resulting in the basement areas being flooded. Staff manually pumped out the water but discovered that part of the pumping system was not functioning automatically. Due to significant damage to operational equipment, emergency interventions are now required to restore functionality. As a result, the pools are temporarily closed until repairs are completed. While the Svetice complex is closed, other swimming facilities in Zagreb remain open, including the Sports Park Mladost, the Utrina pool (until August 15th), and the Šalati SRC. A new pool in Španskom is expected to open soon.

Bias read (Center): The article presents a factual report on a technical infrastructure issue affecting public recreational facilities. It does not take a political stance, nor does it frame the situation in a way that favors any particular ideological perspective. The focus remains on the administrative response and a

Why factuality (85): The article accurately reports on the closure of the Svetice swimming complex due to a technical failure causing flooding in the equipment room. It provides specific details about the issue, the actions taken by the sports objects management, and mentions alternative locations for swimming. The info

Why objectivity (80): The tone remains neutral, presenting facts without emotional language. However, there is a slight emphasis on the inconvenience caused by the closure, which may lean slightly towards a public service perspective.

Večernji list logoVečernji listIndependentCenterFactual 60Objective 70yesterday
For washing, fog and eternal flame, here's how much it costs to maintain the Monument to the Fatherland.

The article discusses the maintenance requirements and costs associated with the 'Spomenik domovini' monument in Zagreb, Croatia. The monument, officially unveiled in December 2020, consists of three components: the Wall of Light, the Eternal Flame Monument, and the Portal Pavilion. It includes complex systems such as irrigation, fountains, and lighting. The city of Zagreb has initiated a public consultation process to select a company for maintaining the monument over approximately 180,000 years. The maintenance contract will last one year and involves tasks like cleaning the stone walls with specific detergents, preventing water contamination in the fountain system, addressing vandalism, and managing the misting system controlled from the National Library’s workshop. The monument was previously damaged during an earthquake and required repairs costing around €33,000.

Bias read (Center): The article presents factual information about the maintenance of a public monument, focusing on technical specifications and administrative processes. There is no overt ideological framing or emphasis on political agendas. The tone remains neutral, providing details about the monument's structure,

Why factuality (60): This article discusses the maintenance of the Spomenik Domovini, which is unrelated to the main event covered by the other articles. As such, it does not contribute to the cross-source consensus on the swimming facility closures. The lack of connection to the main topic reduces its relevance for fac

Why objectivity (70): The tone is informative and objective, focusing on the maintenance requirements of the monument. There is no evident bias or emotional language, maintaining a neutral stance throughout.

Keep the news honest.

ObjectiveNews is reader-funded and ad-free — we show you the bias instead of hiding it. Support independent journalism for €5/month.

Become a Supporter

Related stories