The former Aciso building in Río Ceballos has begun demolition after nearly five decades of abandonment. Construction started in 1976 but was halted in 1977, leaving the structure as a symbol of urban neglect and safety risks. Mayor Ezequiel Lemos announced the gradual removal of five floors over time, emphasizing both structural concerns and symbolic significance. The process involves careful planning, manual labor, and safety measures to avoid disrupting traffic or pedestrian movement. The demolition is part of a broader strategy to revitalize the city’s urban development plans, including the creation of a new zoning code aimed at guiding future growth.
Bias read (Center): The article presents the demolition as a municipal initiative driven by safety and urban renewal goals, without overtly promoting ideological positions. While the mayor emphasizes symbolic change and urban planning, there is no clear partisan framing or emphasis on specific political agendas. The ph




