ON
← Back to feed
Storm hits CDMX; users record the moment a Cable Bus cabin swayed in the air
MX🏛️ PoliticsCenter12 days ago

Storm hits CDMX; users record the moment a Cable Bus cabin swayed in the air

On August 1st, intense rains accompanied by strong winds affected several boroughs of Mexico City, causing significant disruptions to the Cablebús transportation system. Several gondolas halted mid-trip due to safety protocols triggered by the severe weather conditions. During this stoppage, the wind caused the cabins to violently sway back and forth, creating panic among passengers trapped inside. The incident was captured on video by passengers and witnesses, which quickly spread across digital platforms. These videos showed the extent of the swaying of the structures while rain hit directly against the windows. According to recordings shared on social media, the suspension of movement aims to prevent derailments or major accidents during severe weather events. However, the experience generated fear among citizens. Online reactions ranged from concern to strong criticism regarding the reliability of aerial urban transport during extreme weather conditions. Some users advised avoiding such transportation during storms until they pass, while others questioned the efficiency of the system for large-scale operations. Telepherial transport systems respond to strict international cable

The government of Mexico City has begun construction on Line 4 of the Cablebús system, which will connect the Cetram University area in Coyoacán with the Pedregal de San Nicolás neighborhood in Tlalpan. The project includes adjustments to the location of one of its eight stations, originally planned for the Miguel Hidalgo Market, due to opposition from local vendors who feared prolonged disruptions to their businesses. Instead, the station will be relocated to Campo Xóchitl, a nearby site that offers more favorable conditions for both the project and the affected merchants. Construction work has already started at the Cetram University site, where preliminary works are underway to build the first terminal of the new line. This location connects directly with Metro Line 3, facilitating seamless transfers for passengers. A pilot structure has been installed there to link with the future Cablebús station. Meanwhile, technical studies and the development of the project’s executive plan have been completed, allowing contractors such as Alfa Proveedores and LEITNER Ropeways to proceed with building the stations along the route. The relocation of the station was the result of several months of negotiations between local business owners and city authorities. According to a vendor, the market operators rejected the original proposal because they were promised a temporary relocation within 15 days, but faced uncertainty over whether their businesses would remain operational during the two-year period required for the project. They were offered financial support through unemployment insurance, but this did not fully address the concerns of all families involved. The vendors ultimately chose Campo Xóchitl, believing it to be a more viable option despite the logistical challenges. The secretary of Works and Services, Raúl Basulto, confirmed that the adjustment does not alter the original route of Line 4. He explained that while the location of the station has changed slightly, the overall path remains unchanged, with the market just a few meters ahead and Campo Xóchitl a few meters behind. The official emphasized that the movement of the Cablebús will continue as planned, unaffected by the change in station placement. He also noted that the construction of the remaining stations will begin soon, coordinated with the Tlalpan municipality. In parallel, manufacturing of the electromechanical systems that will power the Cablebús cabins has already commenced in Austria. These components will enable the operation of the system in southern Mexico City. The project represents a major infrastructure investment aimed at improving urban mobility and reducing travel times between key districts. However, some residents near the proposed routes have raised concerns about potential disruptions to local traffic and the risk of overcrowding, similar to issues currently affecting the Metro system. On August 1, heavy rains and strong winds caused temporary halts in the operation of the Cablebús, prompting concern among users. Several cabins stopped mid-trip as safety protocols were activated to prevent accidents during severe weather. Video footage captured the dramatic swaying of the cabins, causing panic among passengers. While these measures are standard practice under international guidelines for cable transport systems, the incident sparked widespread criticism online, with many questioning the reliability of the system during extreme weather conditions. Authorities advised citizens to stay informed about weather alerts before using elevated transportation systems.

3 reports

El Universal logoEl UniversalIndependentCenterFactual 85Objective 8012 days ago
Rains affect public transport operation in CDMX; suspend service of Line 2 of the Cable Bus due to electric storm

Heavy rains affected public transportation operations in Mexico City tonight. The Cablebús service on Line 2 was partially suspended between the Constitution of 1917 and Xalpa stations due to a thunderstorm, which caused passengers to disembark. Service has resumed from Xalpa to Santa Marta. Meanwhile, the Metro implemented safety measures on multiple lines, reducing train speeds to ensure passenger safety during the rain. The storm is expected to end soon, after which full service will resume.

Bias read (Center): The article reports on weather-related disruptions to public transportation services in Mexico City. It provides factual information about the suspension of Cablebús Line 2 and the Metro's safety measures due to heavy rainfall and thunderstorms. There is no indication of political bias, framing, or议

Why factuality (85): The article reports that heavy rains affected public transportation operations in Mexico City, specifically mentioning the partial suspension of Line 2 of the Cablebús due to an electrical storm. It also mentions the Metro implementing safety measures due to rain. These details align with typical re

Why objectivity (80): The tone remains neutral, presenting facts about service suspensions and safety measures without overt bias. However, the inclusion of a promotional message at the end may slightly detract from the objectivity, though it is common in media outlets.

El Universal logoEl UniversalIndependentCenterFactual 85Objective 8017 days ago
Storm hits CDMX; users record the moment a Cable Bus cabin swayed in the air

On August 1st, intense rains accompanied by strong winds affected several boroughs of Mexico City, causing significant disruptions to the Cablebús transportation system. Several gondolas halted mid-trip due to safety protocols triggered by the severe weather conditions. During this stoppage, the wind caused the cabins to violently sway back and forth, creating panic among passengers trapped inside. The incident was captured on video by passengers and witnesses, which quickly spread across digital platforms. These videos showed the extent of the swaying of the structures while rain hit directly against the windows. According to recordings shared on social media, the suspension of movement aims to prevent derailments or major accidents during severe weather events. However, the experience generated fear among citizens. Online reactions ranged from concern to strong criticism regarding the reliability of aerial urban transport during extreme weather conditions. Some users advised avoiding such transportation during storms until they pass, while others questioned the efficiency of the system for large-scale operations. Telepherial transport systems respond to strict international cable

Bias read (Center): The article reports on a natural disaster event affecting public infrastructure, focusing on the operational challenges faced by the Cablebús system during severe weather. It presents both the technical measures taken by the system and public reactions without overtly favoring any side. The framing,

Why factuality (85): The article accurately describes the event of August 1st where strong winds caused Cablebús cabins to sway mid-trip, citing user videos and explaining safety protocols. It aligns with the cross-source consensus as no conflicting information is present in other articles. Minor details like specific d

Why objectivity (80): The article maintains a mostly neutral tone, describing events objectively with some descriptive language such as 'desató el caos' and 'generó pánico,' but these phrases are based on witness accounts rather than editorializing. The inclusion of social media reactions adds context without overt bias.

Animal Político logoAnimal PolíticoIndependentCenterFactual 40Objective 10019 days ago
Lines 4, 5 and 6 of the CDMX Cable Bus: routes, progress and cost of works

The article discusses the progress, routes, and costs associated with the construction of lines 4, 5, and 6 of the CDMX Cablebús system. It provides information on the current status of these projects, their planned routes, and the financial investment required for their development. The report highlights the ongoing efforts to expand the city's public transportation infrastructure, aiming to improve mobility and reduce traffic congestion in Mexico City.

Bias read (Center): The article presents factual information about the progress, routes, and costs of the Cablebús project without apparent ideological framing. It does not show clear bias toward any political side, focusing instead on providing objective data and updates on the infrastructure developments.

Why factuality (40): This article does not discuss the storm event described in the other articles. Instead, it focuses on construction updates for the Cablebús Line 4. Since it covers a different topic entirely, it lacks factual relevance to the storm incident. There is no contradiction with other sources since it addr

Why objectivity (100): The article presents factual information about the construction of the Cablebús Line 4 without any apparent bias or subjective language. It provides details about route changes and community concerns, maintaining a neutral and informative tone throughout.

How each side covered it

The same event, grouped by the political lean of the outlets covering it.

How each side covered it

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Covered around the world

The same event as reported in other countries.

Covered around the world

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Claims check

Key factual claims, and how many sources assert vs dispute each.

Claims check

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Keep the news honest.

ObjectiveNews is reader-funded and ad-free — we show you the bias instead of hiding it. Support independent journalism for €4/month.

Become a Supporter

Related stories