ON
← Back to feed
Another Slovenian madness: the Swiss opened a factory of the future in Lendava, and the Slovenian train still runs there through Croatia
Slovenia🏛️ PoliticsLean Progressive20 hr. ago

Another Slovenian madness: the Swiss opened a factory of the future in Lendava, and the Slovenian train still runs there through Croatia

The article highlights the infrastructure challenges faced by the town of Lendava in Slovenia, emphasizing that it is the only Slovenian city accessible by rail only through neighboring Croatia. Despite this, a high-tech pharmaceutical plant operated by Lek (under the Swiss Sandoz umbrella) has opened in Lendava, signaling economic potential. However, the region lacks modern rail connections necessary to support the plant’s logistics and broader economic development. The article criticizes the government for failing to address these issues, pointing out that current transportation strategies rely heavily on trucks rather than efficient rail networks, which harms both the environment and economic growth. It further notes that Slovenia pays Croatia for using its railway infrastructure to reach Lendava, effectively investing in foreign infrastructure instead of building its own.

Slovenia's infrastructure shortcomings have once again come under scrutiny after a Swiss pharmaceutical company opened a high-tech factory in Lendava, a town accessible only via Croatia due to missing rail connections. The new facility, operated by Lek under the umbrella of Sandoz, marks a major economic investment for the region. However, the lack of modern rail links forces reliance on trucks, which contribute to traffic congestion and environmental concerns. Meanwhile, Slovenia’s railways continue to struggle with outdated infrastructure and inefficiencies. The situation highlights a long-standing issue in the Prekmurje region, where the absence of a direct rail link from Beltinci to Lendava has been known since at least 2000. Despite repeated promises and planning, the necessary track has yet to be built. This delay has left local businesses and workers dependent on road networks, increasing both costs and environmental impact. The current rail system requires trains heading to Lendava to detour through Croatian territory, effectively paying Croatia for access to its own land. The problems extend beyond Lendava. Across the country, train speeds have significantly declined despite substantial investments. For example, the Pragersko-Hodoš railway was renovated with nearly half a billion euros to allow speeds of up to 160 km/h. However, damaged concrete sleepers on over 50 kilometers of track have forced trains to reduce their speed to 80 or even 60 km/h. Similar issues plague other routes, such as the one connecting Koper to Austria, where trains often travel at reduced speeds due to infrastructure deficiencies. Travel times have worsened compared to two decades ago. According to financial reports, the journey from Ljubljana to Koper now takes around two hours and thirty minutes on average, whereas it took just two hours and eight minutes twenty years ago. Similarly, the trip from Maribor to Koper has increased from four hours to almost five. These delays are attributed to aging infrastructure, maintenance work, and planned slow zones that are part of the existing schedule. Passengers face additional challenges with frequent delays and limited service options. On the Ljubljana-Koper route, the average delay per 100 kilometers rose from 2.2 minutes in 2019 to 6.7 minutes in 2024. Unofficial tracking sites show that some trains experience delays exceeding 50 minutes compared to scheduled times. For instance, the RG 509 train from Ljubljana to Koper averaged a 16-minute delay over its last 30 trips, while the IC 518 train from Ljubljana to Maribor had an average delay of 13 minutes. These inefficiencies underscore the urgent need for comprehensive upgrades to Slovenia's rail network. While the government continues to emphasize sustainable mobility and green transitions, the reality on the ground suggests that these goals remain unmet without substantial improvements to the rail infrastructure. Local officials and residents are increasingly calling for action, emphasizing the importance of addressing these issues before further investments are made.

How this report was made. Objective News wrote this report from 2 source articles, using AI-assisted synthesis under our methodology. It is our own text, not a copy of any single outlet. Read our methodology.

Responsible editor: Matej BašaSpotted an error? Report it

2 reports

Ljubljanske novice logoLjubljanske noviceIndependentProgressive20 hr. ago
Another Slovenian madness: the Swiss opened a factory of the future in Lendava, and the Slovenian train still runs there through Croatia

The article highlights the infrastructure challenges faced by the town of Lendava in Slovenia, emphasizing that it is the only Slovenian city accessible by rail only through neighboring Croatia. Despite this, a high-tech pharmaceutical plant operated by Lek (under the Swiss Sandoz umbrella) has opened in Lendava, signaling economic potential. However, the region lacks modern rail connections necessary to support the plant’s logistics and broader economic development. The article criticizes the government for failing to address these issues, pointing out that current transportation strategies rely heavily on trucks rather than efficient rail networks, which harms both the environment and economic growth. It further notes that Slovenia pays Croatia for using its railway infrastructure to reach Lendava, effectively investing in foreign infrastructure instead of building its own.

Bias read (Progressive): The article strongly criticizes the government for its failure to develop modern infrastructure, particularly rail connections, which is seen as detrimental to the economy, environment, and national sovereignty. The tone is critical of political inaction and emphasizes the need for urgent action, a

Domovina logoDomovinaIndependentCenteryesterday
Millions for the Railways, but Trains Run Slowly (Part 1)

The article discusses the discrepancy between significant investments in railway infrastructure and the resulting slow train speeds on the Pragersko–Hodoš line. Despite nearly half a billion euros being spent on upgrading the track to allow trains to reach speeds of up to 160 km/h, current operations are restricted to 80 or even 60 km/h due to damaged concrete sleepers over more than 50 kilometers of the route. This highlights concerns about the effectiveness of the investment and raises questions about the management and maintenance of the infrastructure.

Bias read (Center): The article presents factual information about infrastructure performance and does not exhibit clear ideological framing, loaded language, or one-sided sourcing. It focuses on the contrast between investment and outcomes without overtly favoring any political stance.

How each side covered it

The same event, grouped by the political lean of the outlets covering it.

How each side covered it

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Covered around the world

The same event as reported in other countries.

Covered around the world

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Claims check

Key factual claims, and how many sources assert vs dispute each.

Claims check

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Keep the news honest.

ObjectiveNews is reader-funded and ad-free — we show you the bias instead of hiding it. Support independent journalism for €4/month.

Become a Supporter

Related stories