ON
← Back to feed
IAF's long wait for Tejas Mk-1A nears end: Why it matters
India🏛️ PoliticsCenter

IAF's long wait for Tejas Mk-1A nears end: Why it matters

The Indian Air Force (IAF) is expected to induct the Tejas Mk-1A fighter aircraft by the end of the current financial year, ending a significant delay in deliveries that were initially scheduled for early 2024. The initial batch of 83 aircraft will join No. 3 Squadron, addressing critical gaps in the IAF’s fleet, which has dropped to 29 active squadrons against a sanctioned strength of 42. The delay was attributed to technical integration challenges and late delivery of engines by the manufacturer. Air Chief Marshal Ashutosh Dixit confirmed the imminent arrival of the new jets, highlighting their advanced avionics, AESA radar, and improved electronic warfare capabilities compared to previous models. This induction aims to enhance the IAF's combat effectiveness and situational awareness while the service continues development on the Tejas Mk-2 and the fifth-generation AMCA.

The Indian Air Force is set to induct its first squadron of the indigenous Tejas Light Combat Aircraft Mark 1A by the end of March 2027, ending a prolonged wait for the upgraded fighter jet. Air Chief Marshal Ashutosh Dixit, the current Chief of the Air Staff, announced during a media summit in New Delhi that the aircraft would join the force within the current financial year. He stated that the IAF would establish a full squadron before continuing development efforts toward future variants. The initial delivery schedule for the first batch of 83 aircraft was originally targeted for February 2024, but delays pushed the timeline back significantly. Dixit explained that the delay stemmed from integration challenges involving weapons and other systems, alongside the late supply of powerplants. The engine manufacturer, GE Aerospace, failed to deliver the F404-IN20 engines on schedule, which hindered progress. Hindustan Aeronautics Limited, the state-run aerospace company building the jets, missed the original deadline. The first tranche of 83 aircraft was contracted in February 2021 for 36,400 crore rupees. In September 2025, HAL secured a second order for 97 additional Mark 1A jets valued at over 62,370 crore rupees. Deliveries for this second tranche are expected to start in the 2027-28 financial year and conclude over a six-year period. The Mark 1A represents a significant upgrade from the existing Tejas fleet. While sharing the same basic airframe and GE F404-IN20 engine as the current models, the new variant features advanced avionics, sensors, and electronic warfare capabilities. Key additions include an Active Electronically Scanned Array radar, which allows for faster scanning, multi-target tracking, longer detection ranges, and better resistance to jamming. The aircraft is equipped with beyond-visual-range missiles and an electronic warfare suite designed to protect against adversary sensors. Other improvements include an advanced self-protection jammer, an upgraded mission computer, a digital flight-control computer, and smart multifunction displays. The design has also been revised to facilitate easier maintenance and improve overall serviceability. The induction of these jets addresses a critical gap in the IAF’s inventory. The force currently operates 29 active fighter squadrons, well below its sanctioned strength of 42. This level of understaffing is the lowest recorded since the 1960s. Several squadrons have been stood down due to a shortage of aircraft. The IAF currently maintains two squadrons equipped with the older Tejas configuration: No. 18 Squadron and No. 45 Squadron. The new Mark 1A jets are expected to be assigned to No. 3 Squadron. To date, the IAF has ordered 220 Tejas aircraft in total, including 40 fighters and trainers from the initial phase. Two of these aircraft have crashed during their service history. Looking ahead, Dixit indicated that the Tejas Mark 2, a heavier and more advanced variant powered by stronger GE engines, could roll out as early as next year, although its prototype has not yet flown. India is also developing the Advanced Medium Combat Aircraft, a fifth-generation stealth fighter. The selection process for the industrial partners to build the AMCA prototypes is currently underway. Additionally, the IAF plans to procure 114 Rafale fighter jets to form six new squadrons. Over the next decade, the force intends to replace aging fleets, including six Jaguar squadrons, three MiG-29 squadrons, and three Mirage 2000 squadrons. These moves aim to restore the IAF’s combat readiness and modernize its aerial capabilities.

How this report was made. Objective News wrote this report from 2 source articles, using AI-assisted synthesis under our methodology. It is our own text, not a copy of any single outlet. Read our methodology.

Responsible editor: Matej BašaSpotted an error? Report it

2 reports

Times of India logoTimes of IndiaIndependentCenter
IAF's long wait for Tejas Mk-1A nears end: Why it matters

The Indian Air Force (IAF) is expected to induct the Tejas Mk-1A fighter aircraft by the end of the current financial year, ending a significant delay in deliveries that were initially scheduled for early 2024. The initial batch of 83 aircraft will join No. 3 Squadron, addressing critical gaps in the IAF’s fleet, which has dropped to 29 active squadrons against a sanctioned strength of 42. The delay was attributed to technical integration challenges and late delivery of engines by the manufacturer. Air Chief Marshal Ashutosh Dixit confirmed the imminent arrival of the new jets, highlighting their advanced avionics, AESA radar, and improved electronic warfare capabilities compared to previous models. This induction aims to enhance the IAF's combat effectiveness and situational awareness while the service continues development on the Tejas Mk-2 and the fifth-generation AMCA.

Bias read (Center): The article relies on official statements and factual data regarding defense procurement delays and fleet status without employing loaded language or taking a partisan stance.

The Print logoThe PrintIndependentCenter
First Tejas Mk1A squadron to be formed by end of March 2027, says IAF chief Dixit

The Indian Air Force (IAF) plans to form its first squadron of the Tejas Mk1A light combat aircraft by the end of March 2027, according to IAF Chief Air Chief Marshal Ashutosh Dixit. This follows delays in production caused by late delivery of critical components like the F404-IN20 engines from U.S.-based GE Aerospace. The IAF has ordered a total of 180 Mk1A jets, with the first batch of 83 planes initially due in 2024 but now expected to be delivered by 2028. The Mk1A is an upgraded version of the existing Tejas Mk1, featuring advanced radar and BVR missile capabilities. The IAF currently operates at its lowest strength in 60 years, with only 29 active fighter squadrons.

Bias read (Center): The article presents factual updates on military procurement timelines and technical specifications without overtly favoring any political stance or ideology.

How each side covered it

The same event, grouped by the political lean of the outlets covering it.

How each side covered it

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Covered around the world

The same event as reported in other countries.

Covered around the world

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Claims check

Key factual claims, and how many sources assert vs dispute each.

Claims check

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Keep the news honest.

ObjectiveNews is reader-supported: we show you the bias instead of hiding it. Support independent journalism for €4/month.

Become a Supporter

Related stories