7 reports
Gorenjski glasIndependentCenterFactual 90Objective 9010 days ago Flood control works in SzmarcIn Šmari, Slovenia, construction has begun on a new flood protection embankment along the section between Šmari and Nožice. This project is part of a long-awaited phase of the rehabilitation of the Kamniška Bistrica river, carried out by companies Hidrotehnik and Žurbi Eko. The work includes removing the old embankment and building a new one, with completion expected by October. During the construction period, the pedestrian path along the river in this area will be closed, and users are advised to follow instructions from the contractors. The new embankment comes after years of delays, originally planned for 2024, but postponed due to land acquisition issues. The local government confirmed increased funding for the project, raising the budget from 1.6 million to over two million euros. Meanwhile, the damaged bridge near the Virtus sports park remains unrepaired, as funds are prioritized for other urgent flood recovery efforts in the municipality. Construction was briefly halted in the southern part of the Kamniška Bistrica due to the presence of a rare bird species, the 'čebelar' (a type of swallow), which nests in the area. Work will resume in October once the nesting season ends
Bias read (Center): The article provides a balanced overview of infrastructure development and environmental considerations, citing both governmental actions and ecological concerns without overtly favoring any political stance. It reports on decisions made by local authorities and mentions funding allocations, but no
Why these scores (Factual 90 · Objective 90): The article provides detailed and factual information about flood prevention works in Šmarna, including the start of construction, delays, funding increases, and the status of a damaged bridge. The tone is neutral and informative, though it focuses primarily on official statements without contrastin
LokalecIndependentCenterFactual 90Objective 853 days ago Reconstruction in the Old Town: Crossing between Gospejno and Koroško closed in MariborThe company Nigrad has announced ongoing restoration work on historical crossings in the old town center of Maribor. Due to construction activities, the crossing between Gospejna Street and Koroška Road will be completely closed to traffic until July 31. This closure includes the sidewalk, delivery area, and part of Orožna Street. The project involves the complete reconstruction of roads and pedestrian surfaces, improvements to drainage systems, paving, installation of communal infrastructure, and new urban equipment. Funded by the City of Maribor, the project costs over 660,000 euros. According to Nigrad, the renovation aims to improve orderliness and attractiveness of the old town center, enhance conditions for pedestrians, increase safety and accessibility of public areas, and create a more pleasant environment for residents and visitors.
Bias read (Center): The article provides factual information about a city-funded infrastructure project with no apparent ideological framing, biased language, or selective sourcing. It focuses on the practical aspects of the construction and its benefits without taking a stance on political issues.
Why factuality (90): This article confirms the funding approval from the Ministry and includes precise financial figures and project details matching the cross-source consensus. The information is presented clearly and consistently with other articles, showing high factual alignment.
Why objectivity (85): The article maintains an objective tone, presenting facts without overt bias. While it highlights the significance of the project, it does not take sides or express personal opinion beyond reporting the event.
LokalecIndependentCenterFactual 90Objective 857 days ago Maribor has raised almost 3 million euros to develop a park on the Peker CreekThe Municipality of Maribor has received approval for financial support of approximately 2.989 million euros for the first phase of the 'Park ob Pekrskem potoku' project. The project aims to create a new green recreational area offering space for relaxation, sports activities, play, and social gatherings. Construction will be carried out by Lesnina MG oprema d.o.o., with works valued at around 2.68 million euros. The project includes the creation of 18,000 square meters of new green spaces, 239 new trees, fitness areas, walking and cycling paths, a dog park, and other recreational facilities. Mayor Saša Arsenovič emphasized the importance of the park as a valuable addition for all generations, enhancing quality of life and creating a more pleasant urban environment.
Bias read (Center): The article presents information about a municipal infrastructure project without overt ideological slant. While local government decisions can be politically sensitive, the focus is on factual reporting of funding approval and project details. There is no clear attempt to frame the project as ideol
Why factuality (90): The article accurately reflects the funding approval and project details as reported by other sources. Specific numbers and timelines are consistent, reinforcing the reliability of the information. No conflicting data is present.
Why objectivity (85): The language remains neutral, focusing on the project’s impact and benefits without introducing subjective commentary. The emphasis on community benefit is appropriate but slightly leans toward a positive outlook.
VečerIndependent🔒CenterFactual 85Objective 806 days ago (PHOTO) Nearly three million euros for the park at Pekr Creek, work can beginThe city of Maribor has taken a significant step toward realizing one of the largest green investments in the city with the approval of nearly three million euros in European and state funds for the Park ob Pekrskem potoku project—Phase One. The total value of the investment is estimated at around 3.25 million euros. The municipality has already selected the company Lesnina MG oprema for construction and installation work, valued at 2.68 million euros, and construction is expected to begin shortly. Implementation of Phase One is planned over fourteen months from the start of work, with adjustments made as needed based on weather conditions or the most suitable time for planting trees and other vegetation. The new park layout along the Pekrska stream will bring approximately 18,000 square meters of green space, including new walking and cycling paths, a bridge over the stream, playgrounds, outdoor fitness equipment, a pump track, a skate park, and new urban park facilities. Special emphasis will be placed on greening the area, with 239 new trees planted, 52 additional trees transplanted, and more than five thousand square meters dedicated to flowering lawns, which will serve as an重要
Bias read (Center): The article reports on a municipal infrastructure project involving public funding and planning, but presents factual information without overt ideological framing or biased language. It focuses on the logistics, financial aspects, and benefits of the park development without taking a stance on the
Why factuality (85): The article reports on the approval of funding for the Park ob Pekrskem potoku project by the Ministry of Cohesion, Regional Development, and Local Self-Government, aligning with the cross-source consensus. It provides specific figures and details about the project scope, selected contractor, and ti
Why objectivity (80): The tone remains neutral and informative, focusing on the progress and benefits of the park development. There is minimal editorializing, though the emphasis on the park being 'namenjen vsem generacijam' may slightly lean towards positive sentiment.
Maribor24IndependentCenterFactual 80Objective 857 days ago PHOTO: In two months, the start of extensive renovation in Maribor, Slovenska Street will look like thisThe city of Maribor plans to begin a major renovation of Slovenka Street in two months. The project includes updating communal water systems, redesigning the road surface, planting 17 new trees and shrubs, renovating pedestrian areas, and creating new bike lanes. Parking spaces will remain but will be covered with grass tiles, while the area designated for deliveries to the Maribor National Theatre will stay unchanged. The goal is to make the street more pleasant for walking and daily commutes.
Bias read (Center): The article discusses a local infrastructure improvement project focused on urban design and public space enhancement. It does not mention any political figures, parties, policies, or controversial issues. The content is purely informational and neutral in tone.
Why factuality (80): The article provides clear details about the water supply interruption, including dates, affected areas, and reasons for the disruption. This information is factual and consistent with typical municipal announcements.
Why objectivity (85): The tone is informative and neutral, explaining the situation without taking sides or expressing unnecessary emotion. The focus is purely on informing readers about the service disruption.
Maribor24IndependentCenterFactual 75Objective 706 days ago Maribor will soon be richer for the park along the Pekr Creek, the municipality has raised almost 3 million euros for the arrangementThe Municipality of Maribor has received nearly 3 million euros in European and national funds for the first phase of the 'Park ob Pekrskem potoku' project. This funding allows construction to begin soon, with the park set to include over 239 new trees, 18,000 square meters of green space, and facilities such as walking paths, playgrounds, fitness areas, and dog parks. The selected contractor, Lesnina MG oprema d.o.o., has been awarded a contract valued at approximately 2.68 million euros. The total estimated cost of the project is around 3.245 million euros, with the approved support being crucial for initiating this significant green investment. Mayor Saša Arsenovič emphasized the importance of creating a family-friendly space that promotes health and quality of life, positioning the park as a new popular recreational area in Maribor.
Bias read (Center): The article presents information about a municipal infrastructure project funded by public sources. While the topic relates to local governance and public spending, the tone remains neutral, focusing on factual updates and quotes from officials without overtly promoting any political agenda. The phr
Why factuality (75): While this article mentions the upcoming renovation of Slovenska ulica, it lacks detailed information about the funding or connection to the main park project. The content appears more general and less aligned with the cross-source consensus on the park funding.
Why objectivity (70): The tone is somewhat promotional, suggesting improvements will make the street 'prijetnejša,' which introduces a slight positive spin. The focus on aesthetics may imply a preference for certain design outcomes.
LokalecIndependentCenteryesterday In the area of Kungota and Pesnica, there will be a multi-hour interruption of the supply of drinking waterThe Maribor Water Supply Company has announced that due to urgent maintenance work, the supply of drinking water will be interrupted for several hours on Thursday, July 16, 2026, in the areas of the municipalities of Kungota and Pesnica. The disruption is expected to last between 8:00 AM and 1:00 PM. Affected users will be in parts of the villages of Gradiška (house numbers 15 to 15g and 102 to 130) and Spodnje Dobrenje (house numbers 46č to 70). The company emphasized that they are aware of the importance of reliable water supply and aim to complete the work as quickly as possible to minimize disruptions for residents.
Bias read (Center): The article reports on a scheduled infrastructure maintenance event affecting water supply, which is a public service issue. There is no indication of political controversy, bias, or framing that favors any particular side. The information provided is neutral and factual, focusing solely on the fact
★
Keep the news honest.
ObjectiveNews is reader-funded and ad-free — we show you the bias instead of hiding it. Support independent journalism for €5/month.
Become a Supporter