ON
← Back to feed
Emcali announces scheduled water cut this Wednesday, July 22 in Cali: know the neighborhoods and hours of the measure
CO🏛️ PoliticsCenter13 days ago

Emcali announces scheduled water cut this Wednesday, July 22 in Cali: know the neighborhoods and hours of the measure

Emcali, las Empresas Municipales de Cali, anunciaron un corte programado de agua este miércoles 22 de julio de 2026 en varios sectores de la ciudad. Durante las horas de 8:00 a.m. a 4:00 p.m., se suspenderá el servicio en los barrios La Legua, Trapichito, Mateguadua y La Iglesia, ubicados en la Comuna 1. Además, se realizarán trabajos de mantenimiento en la red de acueducto, energía y alcantarillado, incluyendo la limpieza de canales pluviales y la corrección de fallas eléctricas. Los usuarios pueden consultar más detalles en el sitio web oficial de Emcali.

Emcali, the municipal enterprises of Cali, announced scheduled water cuts on Wednesday, July 22, 2026, affecting several neighborhoods in the city. The disruptions are part of planned maintenance and modernization efforts aimed at improving public services. Operations teams will conduct preventive work and repairs on the infrastructure related to water supply, electricity, and sewage systems across different areas of Cali and surrounding zones. The operations include interventions in the water distribution network, which will involve washing the tank at the Terrón IV Water Pumping Station. These activities are intended to enhance the quality of potable water delivered to households. As a result, the water service will be temporarily suspended from 8:00 a.m. to 4:00 p.m. on the specified date. The affected sectors within Commune 1 include La Legua, Trapichito, Mateguadua, and La Iglesia, specifically within the area bounded by Avenues 4 West and 8 West, and Streets 23 West and 29 West. In addition to these water-related interruptions, there will be simultaneous attention to leaks and repairs in specific locations. These include Aguablanca at Carrera 28 # 26 B 05, Ciudad Modelo at Carrera 41 # 31 - 16, Aguacatal at Calle 23 D West with Avenue 8 Bis, Juan Pablo in the municipality of Yumbo at Calle 15 # 13 - 00, and Acopi at Calle 15 # 29 - 69. Maintenance work on the power grid will take place in the La Reforma circuit, focusing on inspections in the alley Las Terrazas near house number 20. This inspection aims to address electrical issues and restore service in the area. Meanwhile, the sewage department will continue with preventive cleaning and dredging tasks. These works will occur along the South Channel, between the neighborhoods of Mariano Ramos and Ciudad 2000, as well as in the regulation ponds of Charco Azul and El Pondaje. Heavy machinery such as excavators and dump trucks will be used during these operations. Residents affected by these scheduled interruptions can find detailed information about the activities on Emcali's official website at www.emcali.com.co. The company emphasized its commitment to ensuring the continuity of its services through these planned interventions. The scheduled maintenance and repair activities reflect Emcali’s ongoing efforts to ensure the reliability and efficiency of public utilities in Cali. By conducting these operations, the company aims to prevent potential service disruptions and maintain high standards of service delivery. The planned interventions cover multiple aspects of urban infrastructure, including water supply, electricity, and sewage systems, highlighting the comprehensive approach taken to manage and improve public services. These operations are part of a broader strategy to enhance the resilience and performance of critical infrastructure in the region. The coordination of various departments ensures that each aspect of the city's utility networks receives necessary attention. Residents are advised to stay informed about the schedule and affected areas to minimize inconvenience during the planned service interruptions. The execution of these maintenance tasks involves specialized personnel and equipment, underscoring the complexity and scale of the operations. Each activity is carefully planned to balance the need for infrastructure improvements with the necessity of minimizing disruption to daily life. The focus on both preventive measures and corrective actions demonstrates a proactive stance towards maintaining the integrity of essential services. As the scheduled maintenance proceeds, the impact on local communities will be monitored to ensure that the operations meet their objectives while addressing any unforeseen challenges. The involvement of technical staff and the use of advanced machinery highlight the resources dedicated to sustaining the functionality of public utilities in Cali.

1 reports

El Tiempo logoEl TiempoIndependentCenterFactual 85Objective 9013 days ago
Emcali announces scheduled water cut this Wednesday, July 22 in Cali: know the neighborhoods and hours of the measure

Emcali, las Empresas Municipales de Cali, anunciaron un corte programado de agua este miércoles 22 de julio de 2026 en varios sectores de la ciudad. Durante las horas de 8:00 a.m. a 4:00 p.m., se suspenderá el servicio en los barrios La Legua, Trapichito, Mateguadua y La Iglesia, ubicados en la Comuna 1. Además, se realizarán trabajos de mantenimiento en la red de acueducto, energía y alcantarillado, incluyendo la limpieza de canales pluviales y la corrección de fallas eléctricas. Los usuarios pueden consultar más detalles en el sitio web oficial de Emcali.

Bias read (Center): El artículo presenta información objetiva sobre medidas técnicas y operativas llevadas a cabo por Emcali, sin tomar partido político ni emitir juicios valorativos. No hay sesgo evidente en el lenguaje o en la selección de fuentes, lo que justifica un posicionamiento central.

Why factuality (85): The article provides specific details about the scheduled water cut-off by Emcali, including the date (July 22, 2026), affected areas (La Legua, Trapichito, etc.), and time frame (8:00 AM to 4:00 PM). These details align with what would be expected from a public utility company announcing planned ma

Why objectivity (90): The article presents the information in a neutral tone, focusing on the operational work being carried out by Emcali. It avoids emotional language or bias, simply stating the facts of the planned service interruption and the reasons behind it.

How each side covered it

The same event, grouped by the political lean of the outlets covering it.

How each side covered it

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Covered around the world

The same event as reported in other countries.

Covered around the world

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Claims check

Key factual claims, and how many sources assert vs dispute each.

Claims check

Support independent, bias-aware news and unlock the social pulse, community voting, and every other Supporter feature.

Become a Supporter

Keep the news honest.

ObjectiveNews is reader-funded and ad-free — we show you the bias instead of hiding it. Support independent journalism for €4/month.

Become a Supporter

Related stories