7 reports
Gorenjski glasIndependentCenterFactual 90Objective 954 days ago They're building a new school dental clinic.In Kranj, new school dental clinic construction has begun at Predoslje Primary School. The project, which previously operated on-site but was temporarily relocated due to space constraints and outdated equipment, will be completed by the end of the year at a cost of approximately 376,500 euros. The contractor, Adaptacije-Vzdrževanje, will build a standalone ground-floor pavilion adjacent to the school complex, integrating with existing infrastructure without significant changes to traffic arrangements or parking areas.
Bias read (Center): The article presents factual information about a local infrastructure project without overt ideological framing. It focuses on administrative decisions, funding allocation, and logistical aspects of construction, with no indication of partisan emphasis or loaded language. The tone remains neutral,客观
Why factuality (90): The article accurately describes the construction of a new school dental clinic near Kranj, including the budget, contractor, and timeline. The details match those found in another article about the same project, indicating strong cross-source consensus.
Why objectivity (95): The article remains neutral in tone, presenting only factual information about the project without any bias or opinion. It focuses on the logistics and benefits of the project without editorializing.
Gorenjski glasIndependentCenterFactual 90Objective 957 days ago Construction of a new school dental clinic in the suburbs of GlasseConstruction has begun on a new school dental clinic at the Primary School in Predoslje, Kranj. The municipal government of Kranj is investing €376,000 to bring dental care services back to the local area, where the clinic previously operated successfully within the school premises before temporarily relocating to the Kranj Dental Polyclinic due to space constraints and outdated equipment. The new facility will be a standalone pavilion-style building located next to the existing school complex, designed to match the architectural style of the current school. Construction includes connecting the new structure to existing utility and energy infrastructure, with minimal changes expected to traffic arrangements and parking areas. The project was awarded to the Ljubljana-based company Adaptacije-Vzdrževanje through a public procurement process, and completion is expected by the end of this year. Once finished, the new clinic will improve access to preventive and curative dental care for children and restore an important health service in their local community.
Bias read (Center): The article provides a factual account of a municipal construction project involving public investment and local healthcare services. It presents information objectively, citing the municipality’s statement and the chosen contractor without apparent ideological framing or biased language. There is a
Why factuality (90): This article provides detailed information about the construction of a new school dental clinic in Predoslje, matching the content of another article on the same topic. It includes the budget, contractor, and expected completion date, showing high accuracy and alignment with other sources.
Why objectivity (95): The article is written in a neutral and factual tone, avoiding any subjective language or bias. It focuses solely on the logistical aspects of the project and its benefits to the community.
Primorske noviceIndependentCenterFactual 85Objective 903 days ago A cycling link is promised VrtojbaKKrižcijanThe municipality of Šempeter-Vrtojba has signed a contract for a significant infrastructure project involving the construction of a two-way cycling path connecting Vrtojba and Križcijan. The first phase of the project, valued at around €507,000 including VAT, includes building the cycling path, improving drainage along the road, and planting new trees alongside the route. This part of the project is partially funded by European cohesion policy funds under the 2021–2027 program. The second phase involves the complete renovation of an aging public water supply system, estimated at around €225,000 including VAT. Construction is expected to begin in 2027 and be completed by mid-2028. The project aims to improve safety for cyclists and pedestrians who currently share the road with motor traffic.
Bias read (Center): The article reports on a local infrastructure project with funding from EU programs. It provides factual information about the project's components, costs, and funding sources without showing clear ideological bias or favoritism toward any political side. The tone remains neutral, focusing on the物流和
Why factuality (85): The article provides specific details about the signed contract for the cycling path project between Vrtojba and Križcijan, including the total value, funding sources, and project phases. These details align with typical infrastructure reporting and show consistency with other articles covering simi
Why objectivity (90): The article presents the information in a neutral manner, focusing on facts such as the signing of the contract, the project breakdown, and the expected completion date. It avoids subjective language and maintains an objective tone throughout.
Svet24IndependentCenterFactual 80Objective 853 days ago They're gonna build another road.The article titled 'Urejali bodo še eno cesto' (They Will Still Repair One More Road) from Svet24.si reports on ongoing road maintenance efforts in Slovenia. The headline suggests that another road is set to undergo repairs, indicating continued infrastructure work by local authorities. While the content does not provide specific details about which road, the scope of the project, or any controversies surrounding the decision, it implies that such projects remain a priority for local governance. The article appears to focus on routine municipal activities rather than presenting a contentious political issue.
Bias read (Center): The article presents information about a routine municipal activity—road repair—without overtly favoring any particular political stance or ideology. There is no indication of partisan framing, biased language, or selective emphasis that would suggest a clear ideological leaning. The tone remains ap
Why factuality (80): The article clearly explains changes to train access at Ljubljana station, including the phasing out of temporary platforms and the introduction of new ones. It includes dates, operational changes, and official statements from Slovenian Railways, making it factually sound and aligned with standard r
Why objectivity (85): The tone is informative and neutral, focusing on logistical updates without emotional language or subjective commentary. It presents the information objectively based on official announcements.
Gorenjski glasIndependentCenterFactual 80Objective 857 days ago We've cleared the state road and the village centre in Sorica.The article reports on the completion of infrastructure improvements in the village center of Sorica, Slovenia. The project involved reconstructing the regional road and organizing pedestrian areas, bus stops, support structures, meteorological drainage, and street lighting. The investment totaled 514,000 euros, with 370,000 coming from the state and the remaining from the Municipality of Železniki. Local officials emphasized the importance of the work for safety and aesthetics, noting that further improvements are needed, including the exterior of Groharjeva House and agricultural buildings. However, the regional road leading towards Soriška Planina remains unrepaired despite being in poor condition and critical for tourism and regional connectivity.
Bias read (Center): The article presents information about a local infrastructure project without overtly favoring any political group or ideology. It includes quotes from both municipal officials and the national infrastructure authority, providing balanced coverage of the project’s significance and ongoing challenges
Why factuality (80): Article reports on the completion of road improvements in Sorica, including funding, scope of work, and local reactions. It accurately reflects the project details and community input, though it does not mention the broader implications of the infrastructure work beyond the immediate area.
Why objectivity (85): The article maintains a neutral tone, presenting facts about the project and local perspectives without overt bias. The focus is on practical outcomes and community impact rather than advocacy or criticism.
Primorske noviceIndependentCenterFactual 70Objective 805 days ago The resort of Grahovem near Bača is being rehabilitated, and there are plans to restore the damaged houses in the futureThe article discusses ongoing efforts to repair the landslide at Grahovo ob Bači, which has damaged homes beneath the national road. The second phase of the stabilization work was successfully completed this spring, with the local municipality and state technical office investing approximately six million euros. The third phase of repairs is now being prepared, focusing on drainage solutions for the area above the road. Officials from the Municipality of Tolmin, the State Technical Office, and project designers presented their plans during a recent citizens' meeting.
Bias read (Center): The article presents factual information about infrastructure projects and municipal planning without overtly favoring any political ideology. It reports on the progress of a public works initiative and includes input from multiple stakeholders, including local authorities and technical experts, but
Why factuality (70): The article provides detailed information about ongoing work on the plazza at Grahovo ob Bači, including costs, phases of the project, and involvement of local authorities. It aligns with typical reporting standards and offers clear, factual updates without embellishment.
Why objectivity (80): The tone remains neutral, presenting information from multiple stakeholders (občina, Državna tehnična pisarna, projektanti) without taking sides or expressing personal opinion.
Primorske noviceIndependentCenter7 hr. ago Berto's raiding party began to expand into a four-lane car.The expansion of the Bertoška vpadnica (Bertoška Inlet) into a four-lane highway has begun, aimed at improving traffic flow towards the port. Construction involves setting up temporary roadblocks in two phases, starting from the Bertoki Jug intersection heading toward Sv. Anton. These blocks will last until October. Safety barriers and dividers will be installed, with partial closures outside traffic junctions to minimize disruption. The connection to Ankaran will remain intact during construction, though the route may change slightly depending on progress. Simultaneously, the cycling path Parenzana will be reorganized. According to Dars, the project will create a safer and more modern road connection, reducing pressure on local communities. Work on the Bertoška vpadnica will intensify after the completion of the Sermska vpadnica, which is already in use by freight vehicles transporting fuel to storage facilities. The contract for expanding the 1.6-kilometer stretch was signed in March, with Kolektor CPG and CPK responsible for the work. The investment amounts to €19.5 million excluding VAT or €23.8 million including VAT, with completion expected early in 2028.
Bias read (Center): The article provides factual information about infrastructure development without overtly favoring any political stance. It includes quotes from Dars but does not present biased language or selective sourcing. The content focuses on logistics and planning rather than ideological positions.
★
Keep the news honest.
ObjectiveNews is reader-funded and ad-free — we show you the bias instead of hiding it. Support independent journalism for €5/month.
Become a Supporter