Dubai’s Roads and Transport Authority announced the opening of a 1.65-kilometer tunnel on Al Khaleej Street to alleviate congestion in the Deira district. The infrastructure features three lanes in each direction with a capacity of 12,000 vehicles per hour, allowing uninterrupted travel between the Infinity Bridge and Al Wuheida Street. This development is part of the broader Al Shindagha Corridor Improvement Project, which aims to reduce average journey times from 1 hour and 44 minutes to 16 minutes by 2030. Additional components include signalized intersections, road upgrades, and a future 1.4-kilometer bridge connecting Dubai Islands to Bur Dubai. The tunnel also incorporates a large-scale mosaic mural by local artist Maryam Al Hathboor, highlighting the city’s commercial heritage.
Bias read (Center): The article presents standard municipal infrastructure reporting with neutral language, relying exclusively on official RTA statements and technical specifications without editorial commentary or political framing.





